MCP tool
query_power_interconnection_queue_isone_v1
Query the ISO-NE generator interconnection queue — ISO New England's public IRTT "public queue" report, the waiting line of projects that have REQUESTED to connect to the New England grid (CT, MA, ME, NH, RI, VT).
The query_power_interconnection_queue_isone_v1 tool is provided by exascale.build. Install that server in your AI client and the assistant can call it directly.
Servers exposing query_power_interconnection_queue_isone_v1
From the publisher:Query the ISO-NE generator interconnection queue — ISO New England's public IRTT "public queue" report, the waiting line of projects that have REQUESTED to connect to the New England grid (CT, MA, ME, NH, RI, VT). Returns cited, project-level records with ISO-NE's full published structure (all 31 columns of the rendered report): the three megawatt readings kept SEPARATE (`net_mw`, `summer_mw` = ma
Install exascale.build →Parameter Type Description paramsany
Related tools
The same action under a namespaced name on other servers.
Tool lists are read from the live servers (or, for packaged servers, from their documentation) each morning, so this reflects what they exposed at the last refresh. Search all tools.